Media

BACK TO PHOTOS AND VIDEOS

Photos

View of Upper Wawa Dam’s spillway, which helps mitigate flooding in low-lying areas of Rizal province.

View of Upper Wawa Dam’s spillway, which helps mitigate flooding in low-lying areas of Rizal province.

President Ferdinand Marcos Jr. leads the Impounding Process Ceremony of the Upper Wawa Dam held on July 10, 2024. With him are Special Assistant to the President Secretary Antonio Lagdameo Jr., Department of Environment and Natural Resources Secretary Ma. Antonia Yulo Loyzaga, Metropolitan Waterworks and Sewerage System Administrator and Vice Chairman Leonor Cleofas, and Prime Infra President and CEO Guillaume Lucci.

President Ferdinand Marcos Jr. leads the Impounding Process Ceremony of the Upper Wawa Dam held on July 10, 2024 […]

The Upper Wawa Dam, the largest dam to be built in over 50 years, will have a yearlong water supply capacity of up to 710 million liters per day.

The Upper Wawa Dam, the largest dam to be built in over 50 years, will have a year long water supply capacity of up to 710 million liters per day.

Inside the intake of the Wawa Pumped Storage Power Project which aims to support ancillary energy supply and storage requirements for grid stability. This project will have a storage capacity of 6,000 MWh and a generating output capacity of 600 MW.

Inside the intake of the Wawa Pumped Storage Power Project which aims to support ancillary energy supply and storage requirements for grid stability. This project will have a storage capacity of 6,000 MWh and a generating output capacity of 600 MW.

Taken August 2024, the photo shows construction progress of the 600MW Wawa Pumped Storage Power Project, which aims to support ancillary energy supply and storage requirements for grid stability.

Taken August 2024, the photo shows construction progress of the 600MW Wawa Pumped Storage Power Project, which aims to support ancillary energy supply and storage requirements for grid stability.

The Tayabasan Weir is the first phase of the Wawa Bulk Water Supply Project which will ensure water security in the East Zone of Metro Manila and the province of Rizal.

The Tayabasan Weir is the first phase of the Wawa Bulk Water Supply Project which will ensure water security in the East Zone of Metro Manila and the province of Rizal.

Prime Waste Solutions’ materials recovery facility in Pampanga is designed to process up to 5,000 tons of solid waste per day and is committed to recovering 80-90% of total waste received.

Prime Waste Solutions’ materials recovery facility in Pampanga is designed to process up to 5,000 tons of solid waste per day and is committed to recovering 80-90% of total waste received.

Inside Prime Waste Solutions Cebu’s materials recovery facility, a baling system compacts waste to reduce methane emissions, maximize space, and allow long-term storage. The facility is focused on resource recovery and can process up to 1,000 tons of waste per day.

Inside Prime Waste Solutions Cebu’s materials recovery facility, a baling system compacts waste to reduce methane emissions, maximize space, and allow long-term storage. The facility is […]

Aerial view of Prime Solar’s PV plant in Tanauan, Batangas which is one of two plants supplying up to 128 megawatts of clean, renewable energy.

Aerial view of Prime Solar’s PV plant in Tanauan, Batangas which is one of two plants supplying up to 128 megawatts of clean, renewable energy.