Prime Solar Solutions Corp. is a subsidiary of Prime Infrastructure Capital Inc., which supplies up to 128 megawatts (MW) of clean and renewable energy from its solar power plants in Tanauan, Batangas and Maragondon, Cavite. It has a 50MW, 20-year power supply agreement with Meralco, and supplies the rest of its output to the grid, all while providing sustainable and socially relevant programs to the surrounding communities.
The Tanauan and Maragondon solar power plants are estimated to have a total annual generation capacity at 202 gigawatt hours, which is expected to power over 84,000 households and displace over 100,000 tons of coal per year.
With the commitment to provide dependable clean energy through its operations, Prime Solar also utilizes digital twin technology, drone verification of progress, optimized string sizing, and 24/7 quality assurance and quality control monitoring both at its factory and at the site.